Document Repository
Key Documents
- gbA Feasibility Study 2017
- Town of Middlebury Downtown Master Plan
- Tell Me! Presentation. Results of a series of library focus groups from 2018.
- Public Library Timeline of Renovation Expansion Efforts 9.8.2021. A summary of the work done to date.
- Draft Charge to Design Team 7.21.21. The library trustee's proposal to get a new design team up and running, including a vision statement for the library building.
- Summary of Work of the LBC 11.10.2016. A summary of the work done by the Library Building Committee, which culminated in a recommendation to the Selectboard for a new building design.
2014-2017 Library Building Committee Archives
- LBC Administration & Planning Process
- LBC Architects RFQ
- LBC Building Deficiencies
- LBC Costs-Budgeting
- LBC Ilsley Photos 10-2017
- LBC Ilsley Programming Needs, Plans, Mission
- LBC Library Trends & Ideas
- LBC Minutes & Timelines
- LBC Reports
- LBC Surveys-Public Feedback
Working Group Documents
- Working Group Summary Report 1.14.2022 (final draft)
- Draft Working Group Summary Report 1.7.2022
- Comments from Bob Champlin 1.6.2022
- Thoughts from Judith on Item D of Report 1.5.2022
- Draft Charge to IPL 100 Project Team 12.29.2021
- Notes from Dennis OBrien 12.29.2021
- Follow Up Notes from John Freidin--Alternate Schemes 12.2.2021
- Follow Up Notes from John Freidin--Table Comparing Schemes 12.2.2021
- Follow Up Notes from Nick Artim--Ilsley Report Info 12.3.2021
- McLeod-Harris Conversation 11.23.2021
- Draft Working Group Summary 11.18.2021
- Draft Working Group Summary 11.11.2021
- Draft Charge to Design Team with edits from Judith 10.29.2021
- Charge for Working Group 10.14.2021