Roof Meeting - September 20205
IPL 100 Project Team Meeting - May 20205
Project Progress Documents-December 2024
Key Documents from the Ilsley 100 Project Team
- Charge to the Ilsley 100 Project Team
- Building Program of Existing Building (75 Main Street)
- Design Presentation 6.30.2022
- Org Chart 5.24.2024
- Explanation of Org Chart 5.24.2024
- Library Facilities Master Plan
Schematic Design
- Presentation Board
- Cost and Funding Summary
- Schematic Estimates
- Level 0 Floor Plan
- Level 1 Floor Plan
- Level 2 Floor Plan
Program Documents
- Preliminary Program Study 7.14.2022
- Draft Adjacency Diagrams
- Supporting Documents
- Collection Space Needs. A document detailing the process for determining collections shelving.
- Vision and Pillars. From the charge to the Project Team.
- Vision Support Spaces. A high level summary of new and expended spaces.
Key Documents from the Working Group and Library Building Committee
- Working Group Summary Report 1.14.2022 (final draft)
- gbA Feasibility Study 2017
- Town of Middlebury Downtown Master Plan
- Tell Me! Presentation. Results of a series of library focus groups from 2018.
- Public Library Timeline of Renovation Expansion Efforts 9.8.2021. A summary of the work done to date.
- Draft Charge to Design Team 7.21.21. The library trustee's proposal to get a new design team up and running, including a vision statement for the library building.
- Summary of Work of the LBC 11.10.2016. A summary of the work done by the Library Building Committee, which culminated in a recommendation to the Selectboard for a new building design.